Formal Certification Procedure
Level 1 HPR Certification
The NAR was created in 1957 as an advocate of the model rocketry hobby. Over the past four decades the hobby has grown to encompass rocket motor types and performance unavailable to the modeler at the NAR's inception. In response to this growth the NAR offers a certification process which permits individuals to purchase and use rocket motors whose physical constraints and performance exceed traditional model rocket boundaries. Rocket motors which exceed model rocketry motor definitions and the models that use these motors are collectively referred to as high power rocketry.
Certification for high power rocketry consists of three progressive levels:
- Level 1 allows the purchase and use of H and I impulse class
motors; solid and hybrid. Certain F and G motors may also require Level 1 certification
for purchase and use.
- Level 2 allows the purchase and use of J, K, and L impulse class
motors; solid and hybrid.
- Level 3 certification allows the purchase and use of M, N, and O impulse class rocket motors; solid and hybrid.
The procedures for Level 1 certification are documented below.
Level 2 certification requires that you hold a valid Level 1 certification before applying. You can examine the HPR Level 2 Certification Procedures for more information, as well as review the HPR Level 2 Study guide.
Level 3 certification requires in-process reviews of the certification model's design and construction prior to flight. Level 3 certification is covered in an application separate from the Level 1 and Level 2 paperwork.
Please note that the NAR high power certification is only one consideration when purchasing and using high power rocket motors. Compliance with local and state laws as well as federal regulations (e.g., FAA FAR Part 101) is also required.
High Power certification is intended to provide a measure of the modeler's competence to avoid gross violations of good modeling practice and safe model operation. The program is not foolproof. A single demonstration of a modeler's skills does not guarantee consistent safe performance. The certification program does not replace competent range personnel (note that high power range safety officers will require high power certification per NFPA 1127) to provide assurance of safe models and operating practices.
- Who Needs HPR Certification?
A person needs High Power certification if they:
- Launch models containing multiple motors with a total installed
impulse of 320.01 Newton-seconds or more, or
- Launches models containing a single motor with a total installed
impulse of 160.01 Newton-seconds or more, or
- Launches rockets that weigh more than 53 ounces (1500 grams), or
- Launches models powered by rocket motors not classified as model
rocket motors per NFPA 1122, e.g.:
- Average thrust in excess of 80.0 Newtons
- Contains in excess of 125 grams of propellant
- Hybrid rocket motors
- Launch models containing multiple motors with a total installed
impulse of 320.01 Newton-seconds or more, or
- Minimum Requirements
- Certification Teams
- The certification team consists of two individuals who are a
minimum of 18 years old and are members in good standing of the NAR.
The certification team members must be unrelated to the applicant.
Members of Tripoli, unless they are also members of the NAR, cannot
participate on a certification team.
- At least one of the team members must be already certified to a
level equal to the certification level being attempted, e.g., a team
member must be certified at Level 1 to judge another individual's
Level 1 certification attempt.
- Level 1 certifications may be administered by a single NAR Level 2
certified individual; the two certified individuals requirement is waived in
this case.
- Certification attempts must be witnessed in person by the certification team. Video recordings of a certification flight are not acceptable.
- The certification team consists of two individuals who are a
minimum of 18 years old and are members in good standing of the NAR.
The certification team members must be unrelated to the applicant.
Members of Tripoli, unless they are also members of the NAR, cannot
participate on a certification team.
- Certification Process and Documentation
- Certification may be accomplished at any launch where sufficient
individuals meeting the requirements of paragraph 2 are available.
- FAA regulations requiring notification or waivers must be complied
with and the launch site must have a FAA waiver for high power models
(greater than 3.3 pounds launch weight and/or 4.4 ounces of
propellant) in effect at the time of launch. All conditions and
restrictions imposed by the FAA must be satisfied and followed.
- The member attempting certification must build the rocket that they
wish to use for their certification attempt. The model may be either scratch
built or a kit and the rocket must be contructed in such a manner that it will
perform safely under the additional stress of an HPR motor. Teams attempting
to certify cannot use the same rocket, but rather are required to each build
their own model. In addition, the member must use an active recovery system
for their certification attempt, which usually includes parachute recovery;
details of these recovery methods are described in the
Definition of Active Recovery.
- The modeler must demonstrate his ability to build and fly a rocket
containing at least one H or I impulse class motor. Cluster or
staged models used for certification may not contain over 640.00
Newton seconds total impulse. In the case of a cluster or staged model, at
least one of the individual motors must be an H or I impulse motor. Combinations
of D, E, F or G motors that meet the impulse requirements do not qualify as
the model does not contain at least one H or I impulse motor. Single use, reloadable,
or hybrid technology motors are permitted. The modeler must assemble the
reloadable motor, if used, in the presence of a certification team
member.
- The individual attempting certification must also complete a
NAR High Power Certification
Application
prior to his certification attempt.
- The model will be subjected to a safety inspection prior to
flight. The safety inspection form is on the back of the NAR High
Power Certification Application. During the safety inspection the
modeler will be expected to provide oral answers to technical
questions related to the safety and construction of his model. The
questions may include (but not limited to) identification of the
model's center of gravity and center of pressure, methods used to
determine model stability, and interpretation of the rocket motor's
designation. The certification team will initial (or check) the
blocks indicating that model safety, motor certification, and the
existence of a FAA waiver (if required) in effect were verified prior
to flight.
- The individual will fly his model. The flight must be witnessed
by the certification team members. Stability, deployment of the
recovery system, and safe recovery should be considered when
evaluating safety of the flight. Models experiencing a catastrophic
failure of the airframe, rocket motor, and/or recovery system (e.g.,
shock cord separation) will not be considered as having a safe
flight.
- The model must be returned to the certification team after flight.
and be inspected to verify engine retention and for evidence of
flight-induced damage. The certification team will initial the blocks
indicating that a safe flight was made and that the post-flight
inspection was satisfactory. In general, the guideline for acceptable
flight damage is that the model could be flown again without repair.
It is left to the judgement of the certification team to differentiate
between flight damage and "normal" maintenance to assure reliability
(e.g., shock cord replacement to prevent future flight problems).
"Zippering" of the body tube is another area of flight damage left to
certification team judgement for acceptability.
- The certification team will sign the certification sheet to
indicate that the certification attempt was successfully completed.
Both the certification sheet and the certification card must be
signed. The certification card and the certification sheet are
normally returned to the certifying individual after the flight. At
club launches or NAR sponsored activities (e.g., NARAM, NSL) the
certification sheets may be retained by the event sponsors to be sent
to NAR Headquarters as a group. In that event, only the certification
card is returned to the certifying individual.
- The certification sheets are returned to
NAR Headquarters.
No fees are required. The certification sheet must be returned by the certified
individual or the event sponsors to NAR Headquarters to allow updating
the NAR database. A new NAR membership card will be issued showing
the certification level upon receipt of the certification
paperwork.
- The certification card is valid for one year after the
certification date or until the end of the NAR member's membership,
whichever comes first. The card is recognized as proof of the
certification level. The certification card should be destroyed upon
receipt of a new NAR membership card which shows the certification
level.
- Falsification of data or statements by the certifying individual will result in revocation of the high power certification. Falsification of data or statements by the certification team, e.g., failure to secure a FAA waiver, can result in revocation of the team members' NAR memberships.
- Certification may be accomplished at any launch where sufficient
individuals meeting the requirements of paragraph 2 are available.
- Level 1 high power certification
(160.01 to 640.00 Newton-seconds impulse)- Certification at this level permits single or multiple motor rocket flights with motors having a maximum total impulse of 640.00 Newton seconds.
- Administrative items
- NAR members who are currently Tripoli Level 1 certified may
grandfather at the NAR Level 1 by completing the identification
portion of a NAR high power application and attaching proof of current Tripoli certification (e.g., photocopy of Tripoli
consumer confirmation card) to NAR headquarters with a request that
their certification level be updated.
- Tripoli certifications will be honored at NAR launches. A current
Tripoli Membership Card is required as evidence of Tripoli
high power certification at launches.
- Lapses in the NAR membership over one year will void all certifications. Certifications will have to be repeated starting with Level 1.
- NAR members who are currently Tripoli Level 1 certified may
grandfather at the NAR Level 1 by completing the identification
portion of a NAR high power application and attaching proof of current Tripoli certification (e.g., photocopy of Tripoli
consumer confirmation card) to NAR headquarters with a request that
their certification level be updated.
The individual seeking Level 1 High Power certification must be a minimum of 18 years old at the time of certification.
A birth certificate or drivers license is an acceptable proof of age.
Note: Other requirements may be imposed by state, or non-USA authorities. This document does not supersede any requirements imposed by the authorities having jurisdiction.. This document does not supersede any requirements imposed by the authorities having jurisdiction.
The individual must be a member in good standing of the National Association of Rocketry (NAR) at the time of certification. Evidence of NAR membership will be requested prior to the certification attempt. Acceptable evidence of membership includes the NAR membership card, a canceled check indicating payment of membership fees, or participation in a NAR event where membership status is verified and indicated on the event materials.
Motors used for certification attempts must be currently certified by the NAR, or by another organization (e.g., Tripoli) with a recognized certification program. Manufacturer's designations, not certification test data, will be used to identify suitability for the certification level being attempted (e.g., an H128 is an H, a G75 is a G).
Revision of NOvember 20, 2011
- Certification Teams


